Manual of use of a systems project

Predictive Maintenance

This is a Predictive maintenance/engineering way that is widely used in the production chain where when there is disruption of emergency just a little on the production systems e.g. There is damage to the belt conveyor can lead to the suspension of production flow so that it can cause considerable losses on the company in question. In industries that uses chemical processes, flow production system has been stopped a few seconds alone can cause damage and when it stops a few minutes alone was able to inflict heavy damage is fatal.

dasar Maintenance Predictive Maintenance
basic maintenance

Predictive maintenance aims to know more early possible occurrence of damage to a unit. Familiar with the equipment condition can do action to prevent equipment breakdown at the moment that could led to stagnation of production process. Predictive maintenance consists of the merger of tester, vibro tester, thickness tester.

  1. Merger tester is used to know the prisoner's isolation of electromotor, When the prisoner's isolation, a low need to be done electromotor serlak re, This will prevent the electromotor burst into flames.
  2. Vibro tester serves to determine the vibration of an equipment such as bearing, If the getarannya has surpassed the standards then it needs to be done if the replacement or addition of grease still allows.
  3. While the thickness meter function to find out the thickness of a unit and the rate of wear and tear a piece of equipment so that they can be planned.

How good a machine that has been planned, wear and tear and damage during use, in General can still happen, Nevertheless the rate of wear and tear can still be estimated magnitude when the engine/tool wear under normal conditions.

Especially in the field of electrical equipment and electronics often warned that damages the electrical components is always the danger that threatened that no tools/instruments that can be trusted are able to conduct the examination and measurement against damage components.

Commonly done in practice, an example is replace all the electrical light bulb in a garage or a certain area at a time after the operation in a specified time period, so don't replace them one by one after the bulb turns off.

The example above is a specific example of the approach to predictive maintenance.
So predictive maintenance is a new form of planned maintenance where replacement components/parts done earlier than the time of the occurrence of the damage.

 

 